Height 600 M / 1969 ft
Grid reference SN 907032
The group arrived at the car park at 10.30 a.m. on Saturday 28th January 2012 where the temperature was -2 degrees C. The group consisted of Mal (GW6 OVD), Phil (2W0 PJJ), Dean (2W0 XTP), Andy (GW7 RKC) & Corinne and we headed towards the summit taking in the breathtaking views along the route of the Brecon Beacons.
On reaching the summit the antennas were erected and contacts were soon made with local stations.
We were joined at the summit with Baz (MW0 TOX) and Janet and the dog! Alfie (who helped pull Baz up the hill!).
Contacts were made with a number of local stations and two stations on other SOTA summits and a distant station was heard from Snowdon.
As the sun started to fall below the tree line the temperature soon started to drop and it was time to start packing up and return back to the car.
No comments:
Post a Comment